TOP wood-plastic installation technology
The cutting and drilling
Ordinary wood processing equipment can be on the wood processing, but we still suggest you use alloy hacksaw and drill, saw blade with a fine tooth is beautiful, cutting slow smoothly as well.
Deep hole drilling and hole, it is suggested that the slow smoothly, at the same time to debris removal. Drill diameter slightly less than the diameter of the tapping screw.
●installation
Self tapping screw is the preferred wood installed, we recommend that you choose the right screw connected depth according to specifications, we recommend using 5 x 40, 5 x 50, 5 x 60, 5 x 80 specifications.
When installing either nails or screws, must be pre-perforated, so that the installation can be conducted more smoothly.
Recommendations for installation of nails, nail into the wood surface 2mm above, with a hammer to make the sheet will clastic beat, smooth surface.
Considering the outdoor drainage, debridement and wood of the thermal expansion and contraction, recommended installation left 3‰5‰gap. Installation of floor, floor must be installed on the floor, is not recommended in concrete pavement surface.
The installation of the floor, we suggest sheet length below 220cm, floor space in 30 - 45cm, such as the floor and the floor is not among the 90 degree direction, please before installing engineering analysis.
Following the TOP plastic parts of the floor installation reference data table
Section size ( mm )
Civil or light loading dock ( CM )
Commercial floor and the terminal ( CM )
Sports field ( CM )
Section size(mm)

Civil or light loading dock(cm)

Commercial floor and dock(cm)

Sports field(cm)

135*25

40

35

30

140*25

45

40

35

145×30

50

45

40

   

The maintenance and maintenance
By 1, mold, mildew, berries and leaves caused by pollution: using sodium hypochlorite containing detergent and cleaning agent.
In 2, rust and dirt: the use of phosphoric acid cleaning agent.
By 3, stroke caused by oil and grease pollution: containing degreasing cleaning agent.
4, regular use of tools to remove material at the gap between the debris, ensure the smooth drainage.